Retained source evidence
Activation evidence

Data Readiness

Inspect catalogue coverage, returned periods, quality conditions, and the gates for higher-order intelligence.

123 observed ULB-name candidates · 123 latest-period IHHL rows2024 outcomes + Mar–Aug 2026 operations
Evidence activation / retained snapshots

Descriptive review
is ready.
Scoring remains held.

Access is the beginning. Usable, aligned evidence is what enables a decision.

UNSCORED
From catalogue to eligibility
  1. 01
    Catalogueknown entries
    50
  2. 02
    Account-grantedaccessible endpoints
    42
  3. 03
    Current responses retained27 unchanged · 9 revised
    36
  4. 04
    Scoring eligibleevidence gates unmet
    0

Dataset counts · bar lengths use the 50-entry catalogue as reference.
Eight revised measures are available in Source Reconciliation. Historical views retain their source periods and populations.

42current route responses
retained for review
0current routes
not refreshed in this pass
8historical keys
absent from current catalogue

All six large routes are now reconciled from authenticated export and paginated evidence (42,49,741 rows across 42,502 pages).
Historical keys absent from the current catalogue remain visible as separate vintages; they are not silently merged into current routes.
Inspect the 9 revised routes →

First required data actionApprove an authoritative ULB registry and name-to-ID crosswalk

Trusted joins still need period alignment and quality review. 2 blocked gates remain.

Governed and documented catalogue

42 current authorized routes · 8 historical keys absent from the current catalogue · checked 2026-09-10

50 / 50
DatasetThemeFieldsSchemaSnapshotJoin readinessIntelligence eligibility
SERP Kitchen GardenSERP · Retained historical snapshot
serp_kitchen_garden_api
Green & water
8 fields
district_iddistrict_namekpi_monthmonthshg_kitchen_garden_cummulative_achievement_till_current_monthshg_kitchen_garden_previous_month_achievementshg_kitchen_garden_target_unitsyear
Authenticated Schema Verified
Complete Snapshot · 28 RowsJuly 2026
District GrainUnscored
SERP Swachhata AwarenessSERP · Retained historical snapshot
serp_swachhata_awareness_api
Awareness & schools
8 fields
district_iddistrict_namekpi_monthmonthshg_swachhata_awareness_cummulative_achievement_till_current_monthshg_swachhata_awareness_previous_month_achievementshg_swachhata_awareness_target_unitsyear
Authenticated Schema Verified
Complete Snapshot · 28 RowsJuly 2026
District GrainUnscored
SERP Circular EconomySERP · Retained historical snapshot
serp_circular_economy_api
Circular economy
8 fields
circular_economy_entrepreneurs_cummulative_achievement_till_current_monthcircular_economy_entrepreneurs_previous_month_achievementcircular_economy_entrepreneurs_target_unitsdistrict_iddistrict_namekpi_monthmonthyear
Authenticated Schema Verified
Complete Snapshot · 28 RowsJuly 2026
District GrainUnscored
Sweeping Machines InformationSASA · Retained historical snapshot
sasa_sac_sweeping_machines_information_api
Collection & machinery
8 fields
month_numbermonth_namefin_yearno_of_machines_suppliedulb_nameinserted_datedistrict_nameyear
Public Schema Verified
Complete Snapshot · 28 RowsJuly 2026
Name Crosswalk RequiredUnscored
100% Clearance of Legacy WasteSASA · Retained historical snapshot
sasa_100_percent_clearance_of_legacy_waste_api
Waste management
11 fields
mnth_nmoverall_quantity_remediated_in_lmtoverall_quantitydstrt_nmmnth_noyearfin_yearload_dateulb_nmbalancepercentage_of_completion
Public Schema Verified
Complete Snapshot · 246 RowsJuly 2026
Name Crosswalk RequiredUnscored
50% Green SpacesSASA · Retained historical snapshot
sasa_50_percent_green_spaces_api
Green & water
10 fields
ulb_nmfin_yearmnth_nodstrt_nmyearload_datemnth_nmgreen_spaces_achieved_percentgreen_spaces_achievedgreen_spaces_target_in_nos
Public Schema Verified
Complete Snapshot · 244 RowsJuly 2026
Name Crosswalk RequiredUnscored
50% Green CoverSASA · Retained historical snapshot
sasa_50_percent_greencover_api
Green & water
10 fields
mnth_nomnth_nmgreen_cover_trgts_in_kmsulb_nmyeardstrt_nmload_datefin_yearachvd_percent_in_kmsgreen_cover_achvd_in_kms
Public Schema Verified
Complete Snapshot · 244 RowsJuly 2026
Name Crosswalk RequiredUnscored
50% Rejuvenation of Water BodiesSASA · Retained historical snapshot
sasa_50_percent_rejuvenation_api
Green & water
10 fields
mnth_nmrejuvenation_of_water_bodies_in_nos_targetsdstrt_nmmnth_norejuvenation_of_water_bodies_achivedrejuvenation_of_water_bodies_achived_percentyearulb_nmfin_yearload_date
Public Schema Verified
Complete Snapshot · 244 RowsJuly 2026
Name Crosswalk RequiredUnscored
ULB E-Waste Collection MechanismSASA · Retained historical snapshot
sasa_cdma_ulbs_ewaste_collection_mechanism_api
Waste management
8 fields
monthdistrict_nameyearpercentageewste_rcylr_in_achievedinserted_datetotal_ulbsdistrict_id
Public Schema Verified
Complete Snapshot · 26 RowsAugust 2026
District GrainUnscored
ULB Single-Use Plastic BanSASA · Retained historical snapshot
sasa_cdma_ulbs_single_use_plastic_ban_api
Waste management
8 fields
district_idyeartotal_ulbspercentagesup_ban_in_achievedmonthinserted_datedistrict_name
Public Schema Verified
Complete Snapshot · 26 RowsAugust 2026
District GrainUnscored
Declaration of ODF+ Model VillagesSASA · Retained historical snapshot
sasa_declaration_of_odf_plus_model_villages_api
Sanitation outcomes
10 fields
dstrt_nmdstrt_idfin_yearmonth_namemnth_noyearodf_vlges_declaration_achvmtodf_vlges_declaration_target_unitsload_dateodf_vlges_declaration_achvmt_prcntge
Public Schema Verified
Complete Snapshot · 84 RowsJuly
District GrainUnscored
Establishment of Gobardhan UnitsSASA · Retained historical snapshot
sasa_establishment_of_gobardhan_units_api
Circular economy
10 fields
dstrt_nmgobardhan_achvmntmnth_nogobardhan_achvmnt_prcntgemonth_namedstrt_idyeargobardhan_trgt_uniitsload_datefin_year
Authenticated Schema Verified
Complete Snapshot · 28 RowsPeriod not supplied
District GrainUnscored
Establishment of Plastic Waste Management UnitsSASA · Retained historical snapshot
sasa_establishment_of_plastic_waste_management_units_api
Waste management
10 fields
load_datemnth_nmdstrt_nmyearpwm_units_achvmnt_prcntgedstrt_idfin_yearpwm_units_achvmntpwm_units_trgt_unitsmnth_no
Public Schema Verified
Complete Snapshot · 84 RowsJuly
District GrainUnscored
Households Promoted for Terrace and Kitchen GardensSASA · Retained historical snapshot
sasa_households_promoted_for_terrace_gardening_kitchen_gardens_api
Green & water
9 fields
load_dateterrace_gardening_achieveddistrict_nameterrace_gardening_targeted_membersulb_idmonth_iddistrict_idterrace_gardening_percentageulb_name
Public Schema Verified
Complete Snapshot · 615 RowsJuly 2026
Dataset-specific Ulb IdUnscored
ITC WOW Programme in SchoolsSASA · Retained historical snapshot
sasa_itc_wow_program_in_schools_api
Awareness & schools
10 fields
load_datetrgt_unitsfin_yeardstrt_idmnth_nmyeardstrt_nmachvmntprcnt_achvdmnth_no
Public Schema Verified
Complete Snapshot · 48 RowsJuly 2026
District GrainUnscored
Entrepreneurs Promoted for Circular EconomySASA · Retained historical snapshot
sasa_mepma_entrepreneurs_promoted_for_circular_economy_api
Circular economy
9 fields
month_idcircular_economy_achievedinserted_datecircular_economy_targeted_membersulb_iddistrict_namecircular_percentageulb_namedistrict_id
Public Schema Verified
Complete Snapshot · 615 RowsJuly 2026
Dataset-specific Ulb IdUnscored
Households Promoted for Home CompostingSASA · Retained historical snapshot
sasa_mepma_households_promoted_for_home_composite_api
Circular economy
9 fields
home_composite_targeted_membersdistrict_namehome_composite_percentageinserted_datemonth_iddistrict_idhome_composite_achievedulb_nameulb_id
Public Schema Verified
Complete Snapshot · 615 RowsJuly 2026
Dataset-specific Ulb IdUnscored
C&D Waste ProcessingSASA · Retained historical snapshot
sasa_sac_c_d_waste_processing_api
Waste management
8 fields
month_nameplnt_cpcty_in_tpdulb_namemonth_numberdistrict_namefin_yearyearinserted_date
Public Schema Verified
Complete Snapshot · 6 RowsJuly 2026
Name Crosswalk RequiredUnscored
Door-to-Door E-AutosSASA · Retained historical snapshot
sasa_sac_door_to_door_e_autos_api
Collection & machinery
9 fields
fin_yearyeardistrict_namee_autos_achievemente_autos_achievement_percentagemonth_nameinserted_datee_autos_targetmnth_no
Public Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
Door-to-Door Push CartsSASA · Retained historical snapshot
sasa_sac_door_to_door_push_carts_api
Collection & machinery
9 fields
push_carts_targetmonth_namedistrict_namepush_carts_achievementmnth_nopush_carts_achievement_percentageinserted_dateyearfin_year
Public Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
Door-to-Door Tri-CyclesSASA · Retained historical snapshot
sasa_sac_door_to_door_tri_cycles_api
Collection & machinery
9 fields
tri_cycles_achievement_percentageyeardistrict_nametri_cycles_targetinserted_datemonth_nametri_cycles_achievementmnth_nofin_year
Public Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
FSTP EstablishmentSASA · Retained historical snapshot
sasa_sac_establishing_fstps_information_api
Waste management
9 fields
district_namecapacity_in_kldmonth_nameinserted_datemonth_numberyearoverall_progressfin_yearulb_name
Public Schema Verified
Complete Snapshot · 70 RowsJuly 2026
Name Crosswalk RequiredUnscored
Identification of New IHHLsSASA · Retained historical snapshot
sasa_sac_identification_of_new_ihhls_api
Sanitation outcomes
12 fields
percentage_of_achievementmonth_nameulb_namedistrict_nameinserted_dateyearmonth_numbercompletedihhls_approved_by_mohuano_of_benf_identifiedfin_yearunder_construction
Public Schema Verified
Complete Snapshot · 246 RowsJuly 2026
Name Crosswalk RequiredUnscored
Compactor MachinerySASA · Retained historical snapshot
sasa_sac_machinery_compactors_api
Collection & machinery
8 fields
inserted_datemonth_numberno_of_unitsfin_yearyeardistrict_namemonth_nameulb_name
Public Schema Verified
Complete Snapshot · 24 RowsJuly 2026
Name Crosswalk RequiredUnscored
E-Autos Service ModelSASA · Retained historical snapshot
sasa_sac_machinery_e_autos_service_model_api
Collection & machinery
11 fields
yearno_of_vehicles_supplied_in_nosfin_yearmnth_noulb_namemonth_nameinserted_datedistrict_nametargetactual_wrk_order_issuedpercentage
Public Schema Verified
Complete Snapshot · 166 RowsJuly 2026
Name Crosswalk RequiredUnscored
MSW Processing · CBG UnitsSASA · Retained historical snapshot
sasa_sac_msw_processing_facilities_cbg_units_api
Waste management
9 fields
financial_yearinserted_dateulb_namedistrict_namestatus_txmonth_numbermonth_nametotal_tpdyear
Public Schema Verified
Complete Snapshot · 12 RowsJuly 2026
Name Crosswalk RequiredUnscored
MSW Processing · ISWM FacilitiesSASA · Retained historical snapshot
sasa_sac_msw_processing_facilities_iswm_facilities_api
Waste management
11 fields
total_tpddry_tpddistrict_namestatus_txyearinserted_datemonth_numbermonth_nameulb_namefinancial_yearwet_tpd
Public Schema Verified
Complete Snapshot · 216 RowsJuly 2026
Name Crosswalk RequiredUnscored
Swachh Survekshan · GFC StatusSASA · Retained historical snapshot
sasa_sac_swacch_survekshan_information_gfc_status_api
Sanitation outcomes
5 fields
yeargfc_statusulb_nameinserted_datedistrict_name
Public Schema Verified
Complete Snapshot · 5 Rows2024
Name Crosswalk RequiredUnscored
Swachh Survekshan · National RankSASA · Retained historical snapshot
sasa_sac_swacch_survekshan_information_national_rank_api
Sanitation outcomes
5 fields
national_rankinserted_datedistrict_nameyearulb_name
Public Schema Verified
Complete Snapshot · 74 Rows2024
Name Crosswalk RequiredUnscored
Swachh Survekshan · ODF StatusSASA · Retained historical snapshot
sasa_sac_swacch_survekshan_information_odf_status_api
Sanitation outcomes
5 fields
district_nameulb_nameodf_statusinserted_dateyear
Public Schema Verified
Complete Snapshot · 85 Rows2024
Name Crosswalk RequiredUnscored
Swachh Survekshan Information · Combined (LGD)SASA CDMA · Retained historical snapshot
swacch_survekshan_info_new1_api
Sanitation outcomes
10 fields
dstrt_nmulb_nmgfc_statusodf_statusnational_rankyearlgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 206 Rows2024
Name Crosswalk RequiredUnscored
FSTP/STP Co-Treatment (LGD)SASA CDMA · Retained historical snapshot
fstps_stps_cotreatment_new1_api
Waste management
12 fields
dstrt_nmulb_nmcapacity_in_kldoverall_progressmnth_nomnth_nmyearfin_yearlgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 70 RowsJuly 2026
Name Crosswalk RequiredUnscored
C&D Waste Processing Plants Revival (LGD)SASA CDMA · Retained historical snapshot
cd_waste_process_plants_revival_new1_api
Waste management
11 fields
dstrt_nmulb_nmplnt_cpcty_in_tpdmnth_nomnth_nmyearfin_yearlgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 6 RowsJuly 2026
Name Crosswalk RequiredUnscored
Sewage Treatment Plant Capacity (LGD)SASA CDMA · Retained historical snapshot
sewage_treated_qty_new1_api
Waste management
19 fields
rec_idpckg_nmdstrt_nmulb_s_noplant_s_noulb_nmcapacity_mldcrnt_prgrs_txmnth_nomnth_nmyearfin_yeara_ini_tsu_tslgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 242 RowsJuly 2026
Name Crosswalk RequiredUnscored
PR Gram Panchayat SWPC Availability and Working ConditionSASA PR · Aggregate evidence retained
sasa_pr_no_of_swachh_rathamsoperationalized_for_dry_waste_api_27_aug_2026
Waste management
8 fields
DISTRICT_IDDISTRICT_NAMEBLOCK_IDBLOCK_NAMEGRAM_PANCHAYAT_IDGRAM_PANCHAYAT_NAMEGP_HAVING_SWPCWORKING_CONDITION
Authenticated Schema Verified
Aggregate Retained · 12,874 Registered Gps CountedRegister date not supplied
Gram PanchayatUnscored
PR Swachh Ratham Mandal Operator ReconciliationSASA PR · Retained historical snapshot
sasa_pr_no_of_swpcs_operationalised_api_27_aug_2026
Collection & machinery
4 fields
DISTRICT_IDDISTRICT_NAMESWACHCH_RATHAM_MANDAL_OPERATORSSWACHCH_RATHAM_REPORTED_MANDAL_OPERATORS
Authenticated Schema Verified
Complete Snapshot · 56 RowsPeriod not supplied
District GrainUnscored
PR Door-to-Door Garbage CollectionSASA PR · Aggregate evidence retained
sasa_pr_door_to_door_collection_percentage_of_garbage_api_27_aug_2026
Collection & machinery
12 fields
DISTRICT_IDDISTRICT_NAMEBLOCK_IDBLOCK_NAMEGRAM_PANCHAYAT_IDGRAM_PANCHAYAT_NAMECOLLECTION_DATEMONTH_IDMONTH_NAMEYEARSEGREGATED_WASTE_HOUSEHOLDSIS_COLLECTED
Authenticated Schema Verified
Aggregate Retained · 12,85,814 Distinct Gp-days; 85,769 In The Common First-week Comparison2026-05 – 2026-08 · retained days vary
Gram Panchayat · DateUnscored
CDMA 100% Door-to-Door Collection of MSWSASA CDMA · Aggregate evidence retained
msw_door_to_door_collection_api
Collection & machinery
16 fields
date1district_namedistrict_codeulb_nameulb_codesachivalayam_namesachivalayam_codeactive_indicatortotal_householdscollected_householdsgarbage_segregationi_tsapi_lgd_dist_codeapi_district_nameapi_lgd_mandal_codeapi_mandal_name
Authenticated Schema Verified
Aggregate Retained · 41,635 Distinct Records · Grid Completeness Unproven2026-08-12 – 2026-08-27
Secretariat · DayUnscored
CDMA Identification of Bulk Waste GeneratorsSASA CDMA · Aggregate evidence retained
identification_of_bulk_waste_generators_api
Waste management
13 fields
date1district_namedistrict_codeulb_nameulb_codesecretariat_namesecretariat_codeno_of_bwgsi_tsapi_lgd_dist_codeapi_district_nameapi_lgd_mandal_codeapi_mandal_name
Authenticated Schema Verified
Aggregate Retained · 40,827 Distinct Records · Grid Completeness Unproven2026-08-12 – 2026-08-27
Secretariat · DayUnscored
CDMA On-Site Wet Waste Processing by BWGsSASA CDMA · Aggregate evidence retained
onsite_processing_of_wet_waste_bwg_api
Waste management
13 fields
date1district_namedistrict_codeulb_nameulb_codesecretariat_namesecretariat_codewet_waste_processing_bwgsi_tsapi_lgd_dist_codeapi_district_nameapi_lgd_mandal_codeapi_mandal_name
Authenticated Schema Verified
Aggregate Retained · 40,827 Distinct Records · Grid Completeness Unproven2026-08-12 – 2026-08-27
Secretariat · DayUnscored
CDMA Waste SegregationSASA CDMA · Aggregate evidence retained
waste_egregation_api
Waste management
15 fields
date1district_namedistrict_codeulb_nameulb_codesachivalayam_namesachivalayam_codeactive_indicatortotal_householdsgarbage_segregationi_tsapi_lgd_dist_codeapi_district_nameapi_lgd_mandal_codeapi_mandal_name
Authenticated Schema Verified
Aggregate Retained · 41,635 Distinct Records · Grid Completeness Unproven2026-08-12 – 2026-08-27
Secretariat · DayUnscored
CDMA Construction of Community Sanitary ComplexesSASA CDMA · Retained historical snapshot
construction_of_csc_api
Sanitation outcomes
15 fields
s_nodistrict_namedistrict_idcsc_target_unitscsc_achievementcsc_achievement_percentagemonth_nomonth_nameyearfin_yeara_ini_tsu_tsapi_lgd_dist_codeapi_district_name
Authenticated Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
CDMA Compost PitsSASA CDMA · Retained historical snapshot
compost_pits_api
Waste management
9 fields
district_iddistrict_namework_nameunitsfin_yearmonthtargetachivementlgd_district_name
Authenticated Schema Verified
Complete Snapshot · 336 RowsMarch 2027
District GrainUnscored
CDMA Magic DrainsSASA CDMA · Retained historical snapshot
magic_drains_api
Green & water
9 fields
district_iddistrict_namework_nameunitsfin_yearmonthtargetachivementlgd_district_name
Authenticated Schema Verified
Complete Snapshot · 336 RowsMarch 2027
District GrainUnscored
CDMA Soak PitsSASA CDMA · Retained historical snapshot
soak_pits_api
Waste management
9 fields
district_iddistrict_namework_nameunitsfin_yearmonthtargetachivementlgd_district_name
Authenticated Schema Verified
Complete Snapshot · 336 RowsMarch 2027
District GrainUnscored
CDMA Housing Construction of IHHLsSASA CDMA · Retained historical snapshot
housing_construction_of_ihhls_new1_api
Sanitation outcomes
13 fields
s_nodistrict_nameconstruction_of_ihhls_target_unitsconstruction_of_ihhls_achievementconstruction_of_ihhls_achievement_percentagemonth_nomonth_nameyearfin_yeara_ini_tsu_tslgd_district_name
Authenticated Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
CDMA SBM Construction of IHHLsSASA CDMA · Retained historical snapshot
sbm_construction_of_ihhls_new1_api
Sanitation outcomes
14 fields
s_nodistrict_iddistrict_nameihhls_target_unitsihhls_achievementihhls_achievement_percentagemonth_nomonth_nameyearfin_yeara_ini_tsu_tslgd_district_name
Authenticated Schema Verified
Complete Snapshot · 84 RowsJuly 2026
District GrainUnscored
CDMA MSW CBG UnitsSASA CDMA · Retained historical snapshot
msw_cbg_units_new1_api
Waste management
12 fields
dstrt_nmulb_nmtotal_tpdstatus_txmnth_nomnth_nmyearfin_yearlgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 12 RowsJuly 2026
Name Crosswalk RequiredUnscored
CDMA IHHL New IdentificationSASA CDMA · Retained historical snapshot
ihhl_new_identification_new1_api
Sanitation outcomes
15 fields
dstrt_nmulb_nmihhls_approved_by_mohuano_of_benf_identifiedpercentage_of_achievementunder_constructioncompletedmnth_nomnth_nmyearfin_yearlgd_dist_codedistrict_namelgd_mandal_codemandal_name
Authenticated Schema Verified
Complete Snapshot · 246 RowsJuly 2026
Name Crosswalk RequiredUnscored
CDMA ITC WOW SchoolsSASA CDMA · Retained historical snapshot
itc_wow_schools_api
Awareness & schools
7 fields
dstrt_iddstrt_nmtrgt_unitsachvmntprcnt_achvdlgd_district_codelgd_district_name
Authenticated Schema Verified
Complete Snapshot · 24 RowsPeriod not supplied
District GrainUnscored

A complete snapshot means pagination reconciled to the source total for the exported filter period. It does not prove distinct-key completeness, history, cross-dataset identity, or scoring eligibility.

How the 50 retained and documented entries are used

Every retained source has a visible analytical or supporting role; incomplete and unprovisioned sources remain gated

50 used of 50
50catalogue entries
Account-granted42Complete retained44Visible use50
34 core16 supporting
Core analytical useDrives a headline visual, funnel, registry, outcome view or review queue34
Sweeping Machines InformationSASA · Collection & machinery

Collection inventory and entity-period ambiguity checks

28 rows · July 2026
100% Clearance of Legacy WasteSASA · Waste management

Overview signal, clearance flow, Pareto and balance review

246 rows · July 2026
Establishment of Plastic Waste Management UnitsSASA · Waste management

Processing registry and configured-unit evidence

84 rows · July
C&D Waste ProcessingSASA · Waste management

Processing registry and configured TPD inventory

6 rows · July 2026
Door-to-Door E-AutosSASA · Collection & machinery

District collection source-contrast view

84 rows · July 2026
Door-to-Door Push CartsSASA · Collection & machinery

District collection source-contrast view

84 rows · July 2026
Door-to-Door Tri-CyclesSASA · Collection & machinery

District collection source-contrast view

84 rows · July 2026
FSTP EstablishmentSASA · Waste management

Configured KLD registry and period-conflict quarantine

70 rows · July 2026
Identification of New IHHLsSASA · Sanitation outcomes

Historical IHHL vintage: corroborates the LGD reissue used for household toilets

246 rows · July 2026
Compactor MachinerySASA · Collection & machinery

Collection inventory summary

24 rows · July 2026
E-Autos Service ModelSASA · Collection & machinery

ULB procurement funnel and delivery-gap review

166 rows · July 2026
MSW Processing · CBG UnitsSASA · Waste management

Processing registry and configured TPD inventory

12 rows · July 2026
MSW Processing · ISWM FacilitiesSASA · Waste management

Facility registry, capacity, status distribution and review queue

216 rows · July 2026
Swachh Survekshan · GFC StatusSASA · Sanitation outcomes

Limited 2024 historical outcome evidence

5 rows · 2024
Swachh Survekshan · National RankSASA · Sanitation outcomes

2024 national-rank distribution

74 rows · 2024
Swachh Survekshan · ODF StatusSASA · Sanitation outcomes

2024 ODF distribution

85 rows · 2024
Swachh Survekshan Information · Combined (LGD)SASA CDMA · Sanitation outcomes

Supplied LGD crosswalk; retained 2024 outcome year

206 rows · 2024
FSTP/STP Co-Treatment (LGD)SASA CDMA · Waste management

Supplied LGD crosswalk; configured KLD registry

70 rows · July 2026
C&D Waste Processing Plants Revival (LGD)SASA CDMA · Waste management

Supplied LGD crosswalk; configured plant capacity

6 rows · July 2026
Sewage Treatment Plant Capacity (LGD)SASA CDMA · Waste management

Supplied LGD crosswalk; plant capacity and progress label

242 rows · July 2026
PR Gram Panchayat SWPC Availability and Working ConditionSASA PR · Waste management

Rural sanitation: SWPC coverage and condition across 12,874 gram panchayats

26,702 rows · Register date not supplied · 12,874 registered GPs counted
PR Swachh Ratham Mandal Operator ReconciliationSASA PR · Collection & machinery

Rural sanitation: mandal operators reported vs counted

56 rows · Period not supplied
PR Door-to-Door Garbage CollectionSASA PR · Collection & machinery

Rural cohort: collection activity against the SWPC register

39,65,247 rows · 2026-05 – 2026-08 · retained days vary · 12,85,814 distinct GP-days; 85,769 in the common first-week comparison
CDMA 100% Door-to-Door Collection of MSWSASA CDMA · Collection & machinery

Daily collection: distinct records, zero and missing measures

63,542 rows · 2026-08-12 – 2026-08-27 · 41,635 distinct records · grid completeness unproven
CDMA Identification of Bulk Waste GeneratorsSASA CDMA · Waste management

Reporting continuity: steady, from a minority of secretariats

64,528 rows · 2026-08-12 – 2026-08-27 · 40,827 distinct records · grid completeness unproven
CDMA On-Site Wet Waste Processing by BWGsSASA CDMA · Waste management

Daily processing: positive activity and valid zero observations

64,528 rows · 2026-08-12 – 2026-08-27 · 40,827 distinct records · grid completeness unproven
CDMA Waste SegregationSASA CDMA · Waste management

Daily segregation: concentration and measurement coverage

63,542 rows · 2026-08-12 – 2026-08-27 · 41,635 distinct records · grid completeness unproven
CDMA Compost PitsSASA CDMA · Waste management

Selected-month achievement and target · additivity unconfirmed

336 rows · March 2027
CDMA Magic DrainsSASA CDMA · Green & water

Reported monthly positions, measured in kilometres

336 rows · March 2027
CDMA Soak PitsSASA CDMA · Waste management

Duplicate detection: returns Compost Pits rows, excluded from totals

336 rows · March 2027
CDMA Housing Construction of IHHLsSASA CDMA · Sanitation outcomes

Cross-source reconciliation: Housing IHHL construction

84 rows · July 2026
CDMA SBM Construction of IHHLsSASA CDMA · Sanitation outcomes

Cross-source reconciliation: SBM IHHL construction

84 rows · July 2026
CDMA MSW CBG UnitsSASA CDMA · Waste management

Supplied LGD crosswalk; configured TPD registry

12 rows · July 2026
CDMA IHHL New IdentificationSASA CDMA · Sanitation outcomes

Sanitation delivery funnel and candidate review queue; supplied LGD crosswalk and identity-reach evidence

246 rows · July 2026
Supporting analytical useVisible in reported history, programme portfolio or evidence coverage16
SERP Kitchen GardenSERP · Green & water

SERP district programme portfolio

28 rows · July 2026
SERP Swachhata AwarenessSERP · Awareness & schools

SERP district programme portfolio

28 rows · July 2026
SERP Circular EconomySERP · Circular economy

SERP district programme portfolio with above-target review

28 rows · July 2026
50% Green SpacesSASA · Green & water

Supporting programme portfolio and evidence breadth

244 rows · July 2026
50% Green CoverSASA · Green & water

Supporting programme portfolio and evidence breadth

244 rows · July 2026
50% Rejuvenation of Water BodiesSASA · Green & water

Supporting programme portfolio and evidence breadth

244 rows · July 2026
ULB E-Waste Collection MechanismSASA · Waste management

District programme portfolio

26 rows · August 2026
ULB Single-Use Plastic BanSASA · Waste management

District programme portfolio

26 rows · August 2026
Declaration of ODF+ Model VillagesSASA · Sanitation outcomes

District programme portfolio with ambiguity flags

84 rows · July
Establishment of Gobardhan UnitsSASA · Circular economy

District programme portfolio · endpoint recovered 2026-09-08

28 rows · Period not supplied
Households Promoted for Terrace and Kitchen GardensSASA · Green & water

Five-period monitor and supporting programme portfolio

615 rows · July 2026
ITC WOW Programme in SchoolsSASA · Awareness & schools

Supporting programme portfolio and reported-period evidence

48 rows · July 2026
Entrepreneurs Promoted for Circular EconomySASA · Circular economy

Five-period monitor and supporting programme portfolio

615 rows · July 2026
Households Promoted for Home CompostingSASA · Circular economy

Five-period monitor and supporting programme portfolio

615 rows · July 2026
CDMA Construction of Community Sanitary ComplexesSASA CDMA · Sanitation outcomes

District programme portfolio · community sanitary complexes

84 rows · July 2026
CDMA ITC WOW SchoolsSASA CDMA · Awareness & schools

District programme portfolio · LGD-coded schools programme

24 rows · Period not supplied
Accessible · complete pull pendingEndpoint is readable, but no complete paginated snapshot is retained0
Authorized but unavailableNo complete governed response retained0
Documented · ingestion pendingSchema known; excluded from analytics until complete ingestion0
“Used” means the retained source contributes to a visible deterministic analytical or evidence view. It does not mean the source is eligible for scoring.
Supporting programme portfolioSecondary source-level coverage context · expand for 13 retained sources

Supporting Programme Portfolio

Thirteen retained sources previously buried in the catalogue · latest governed period at original source grain

derived target coverage review condition
Green spacesULB · 2 periods78%
78 / 10038 checks
Evidence conditions

123 latest-period rows · 23 zero targets · 15 above target · 0 percentage conflicts

Green coverULB · 2 periods22%
303.01 / 1.4K6 checks
Evidence conditions

123 latest-period rows · 0 zero targets · 6 above target · 0 percentage conflicts

Water-body rejuvenationULB · 2 periods46%
49 / 10660 checks
Evidence conditions

123 latest-period rows · 60 zero targets · 0 above target · 0 percentage conflicts

E-waste collection mechanismDistrict · 1 period42%
52 / 123reconciled
Evidence conditions

26 latest-period rows · 0 zero targets · 0 above target · 0 percentage conflicts

Single-use plastic banDistrict · 1 period24%
29 / 123reconciled
Evidence conditions

26 latest-period rows · 0 zero targets · 0 above target · 0 percentage conflicts

ODF+ model villagesDistrict · 2 periods99%
3.5K / 3.6K15 checks
Evidence conditions

28 latest-period rows · 15 zero targets · 0 above target · 0 percentage conflicts

Terrace / kitchen gardensULB · 5 periods1.3%
3.4K / 259K105 checks
Evidence conditions

123 latest-period rows · 0 zero targets · 0 above target · 105 percentage conflicts

ITC WOW in schoolsDistrict · 2 periods46%
3.7K / 8.0K2 checks
Evidence conditions

24 latest-period rows · 0 zero targets · 2 above target · 0 percentage conflicts

Circular-economy entrepreneursULB · 5 periods9.1%
89 / 97784 checks
Evidence conditions

123 latest-period rows · 5 zero targets · 4 above target · 75 percentage conflicts

Home compostingULB · 5 periods1.5%
3.9K / 259K116 checks
Evidence conditions

123 latest-period rows · 0 zero targets · 0 above target · 116 percentage conflicts

SERP kitchen gardensDistrict · 1 period57%
403K / 714K5 checks
Evidence conditions

28 latest-period rows · 0 zero targets · 5 above target · 0 percentage conflicts

SERP Swachhata awarenessDistrict · 1 period59%
488K / 833Kreconciled
Evidence conditions

28 latest-period rows · 0 zero targets · 0 above target · 0 percentage conflicts

SERP circular economyDistrict · 1 period222%
11.1K / 5.0K22 checks
Evidence conditions

28 latest-period rows · 0 zero targets · 22 above target · 0 percentage conflicts

Each bar is calculated within one source as aggregate achievement ÷ aggregate target and capped visually at 100%. It is not a composite or cross-programme score.

CompletenessPagination reconciled before use
TimelinessSource period, not ingestion date
Schema validityStrings parsed with quality flags
Evidence traceabilityEvery value retains provenance
Evidence labelWhat this screen rests on
Bundled historical exports
44 full exports + 6 aggregate sources
Bundled historical rows
6,509
Entities observed
123 ULB candidates
Source grain
ULB, district, GP and secretariat
Disputed values
12 across 2 datasets
Missing measurements
Held out · never counted as zero
Cross-month comparisons
Selected same-source pairs only
Formal ratings eligible
0 entities · gates unmet